Skip to content
ClosedNo longer accepting applications

Construction Airfield Blast Shield

DEPT OF DEFENSE.DEPT OF THE AIR FORCE.AIR FORCE GLOBAL STRIKE COMMAND.FA4661 7 CONS CD

This opportunity closed August 7, 2026. 5 similar opportunities are open right now.

Get alerted when new contract opportunities like this open.

Checking your account…

Free. Everyone sees new listings after 10 days. Unsubscribe anytime.

About this archived opportunity

Amendment 1: Response date changed from August 7, 2026 to August 14, 2026 Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and performing all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B. All work shall comply with the contract specifications and shall be in accordance with the latest International Building Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL’s), and all applicable Federal, State and local regulations/codes. The blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations running in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall beconsidered as the standard for this work. At the option of the Contracting Officer, alternate types of blast deflectorsmay be considered provided the drawings and specifications of alternate types are approved by Contracting Officer.The blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blastfence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle 90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ℉ velocity @ 900 MPH. Haul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul Route subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access. Construction Storage Yard & Contractor Limits: Contractor shall store all equipment and material within the designed laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area,the yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. Contractor shall obtain approval for any project limits changes prior to construction commencement from 7 CES through the Contracting Officer. The approved laydown yard will be provided at the pre-construction meeting. Contractor shall provide material submittals for all materials & products used in the project on an AF Form 3000. All PDFs shall be from original electronic documents; no scans allowed due to file size.Work is located in a restricted area. The contractor shall submit a two-week schedule to the Escort POC at least one week prior to work starting to ensure escorts are assigned. The schedule should include start/end times for each day, crew sizes, and work locations. Note: This post is for market research purposes only. No proposals will be reviewed or accepted at this time.

Historical details

Status
Closed
Deadline
August 7, 2026
First captured
August 8, 2026
Publisher reference
ca1619a1576b4c85970aa23b7bc5d0ea

Eligibility: Total Small Business Set-Aside (FAR 19.5)

This opportunity has closed

Construction Airfield Blast Shield

by DEPT OF DEFENSE.DEPT OF THE AIR FORCE.AIR FORCE GLOBAL STRIKE COMMAND.FA4661 7 CONS CD

Get notified when similar opportunities open

We'll save this search and email you when new construction, airfield, blast opportunities are posted. Free.

Refine this search