Skip to content
Open·Ingested today, not yet re-verified. Deadlines can change; confirm on the official page.

31100PR260000060-Replace vertical package unit located at Building 38

HOMELAND SECURITY, DEPARTMENT OF

Place of performance: San Pedro, CA

View solicitation at HOMELAND SECURITY, DEPARTMENT OF

Free. Verify your email, then we send one reminder only.

Posted
Aug 13, 2026
Closes
Aug 21, 2026 (in 8 days)

Get alerted when new contract opportunities like this open.

Checking your account…

Free. Everyone sees new listings after 10 days. Unsubscribe anytime.

At a glance

This is a government contract opportunity posted by HOMELAND SECURITY, DEPARTMENT OF in the plumbing, heating, and air-conditioning contractors category. The deadline is August 21, 2026, 8 days from now. Work is performed in San Pedro, CA. This solicitation carries a Small Business Set Aside - Total set-aside.

Classification and identifiers

Industry (NAICS)
Plumbing, Heating, and Air-Conditioning Contractors (238220)
Product or service (PSC)
Installation of Equipment: Refrigeration, Air Conditioning, and Air Circulating Equipment (N041)
Solicitation number
31100PR260000060
Contracting office
BASE LOS ANGELES/LONG BEACH(00037)
Set-aside
Small Business Set Aside - Total

Who can apply

Small businessWork performed in San Pedro, CA

Small businesses can apply here. Check the eligibility details below to see if your organization fits.

Small Business Set Aside - Total

About this opportunity

*****Amendment 1- Solicitation extended to Aug 21st. Site visit will be conducted on Aug 19th 12pm-2pm.***** 1.01 SCOPE OF WORK: Provide all labor, materials, equipment, and supervision necessary to remove the existing HVAC package unit and supply and install a new vertical package unit (model J48AF-A00XPXXXJ or approved equivalent) located at building 38. The work includes, but is not limited to, the following: 1.02 Remove and replace Existing Unit: A. The Contractor shall replace the left vertical package unit shown in the project photo below. The Contractor shall verify the exact unit to be replaced with the COR prior to removal. B. Disconnect and remove the existing HVAC package unit. C. Properly dispose of the old unit and any associated debris in accordance with local, state, and fed...

Refine this search