Watervliet Arsenal - Lever Cam Recock
DEPT OF DEFENSE
Place of performance: Watervliet, NY
Free. Verify your email, then we send one reminder only.
- Posted
- Aug 14, 2026
- Closes
- Aug 27, 2026 (in 12 days)
Similar opportunities open now
- PARTS KIT,BALL VALVSame funderOpenDEPT OF DEFENSECloses in 16 days
- COUPLING ASSY, 3/8Same funderOpenDEPT OF DEFENSECloses in 3 days
- VALVE,BALLSame funderOpenDEPT OF DEFENSECloses in 3 days
- 1VALVE,REGULATING,FSame funderOpenDEPT OF DEFENSECloses in 2 days
- ADAPTER ASSEMBLY,VASame funderOpenDEPT OF DEFENSECloses in 3 days
At a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the instrument manufacturing for measuring and testing electricity and category. The deadline is August 27, 2026, 13 days from now. Work is performed in Watervliet, NY. This solicitation carries a Small Business Set Aside - Total set-aside.
Classification and identifiers
- Industry (NAICS)
- Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals (334515)
- Product or service (PSC)
- Electrical and Electronic Properties Measuring and Testing Instruments (6625)
- Solicitation number
- W911PT26QA124
- Contracting office
- W6QK ACC WVA
- Set-aside
- Small Business Set Aside - Total
Who can apply
Small businesses can apply here. Check the eligibility details below to see if your organization fits.
Small Business Set Aside - Total
About this opportunity
7 EACH - FIRST ARTICLE APPROVAL REQUIRED - LEVER, CAM, RECOCK, Per Drawing # 11582515, Revision B, For 105mm M20. To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423) which is attached hereto as Exhibit A. Along with general data drawings attached as ATTACHMENT A. (CN 2, 3, 9, 11, 12, 15, 23) *INSPECTION REQUIRED* 7 EACH - FIRST ARTICLE APPROVAL WAIVED - LEVER, CAM, RECOCK, Per Drawing # 11582515, Revision B, For 105mm M20. To include contract data prepared and delivered in accordance with CONTRACT DATA REQUIREMENTS LIST (DD FORM 1423) which is attached hereto as Exhibit A. Along with general data drawings attached as ATTACHMENT A. (CN, 2, 3, 9, 11, 12, 15, 23) *INSPECTION REQUIRED* 41 EACH - FIRST ARTICLE APPROVAL REQUIRED - LEV...
Related opportunities
- PARTS KIT,BALL VALVSame funderDEPT OF DEFENSECloses in 16 days
- COUPLING ASSY, 3/8Same funderDEPT OF DEFENSECloses in 3 days
- VALVE,BALLSame funderDEPT OF DEFENSECloses in 3 days
- 1VALVE,REGULATING,FSame funderDEPT OF DEFENSECloses in 2 days
- ADAPTER ASSEMBLY,VASame funderDEPT OF DEFENSECloses in 3 days
- VALVE,REGULATING,FLSame funderDEPT OF DEFENSECloses in 24 days