260-A9260-018 Trail Bridge Replacement & Stream Stabilization
Northern Virginia Community College
Free. Verify your email, then we send one reminder only.
- Posted
- Aug 14, 2026
- Closes
- Aug 24, 2026 (in 9 days)
Similar opportunities open now
- Multiple Trail Bridges Replacement Project Phase 2OpenAGRICULTURE, DEPARTMENT OFCloses in 17 days
- 2026028-BID3313 Savannah Rapids Pavilion Bank StabilizationOpenColumbia County Board Of CommissionersCloses in 12 days
- Dam Safety Production Center - Huntington (DSPC-H) Industry DayOpenDEPT OF DEFENSENo deadline listed
About this opportunity
The project is generally described as âreplacing the existing pedestrian bridge and performing stream stabilization in thesurrounding channel in accordance with the plans. The work includes installation of grade control features such as constructed riffles, step pools, and log/stone structures to stabilize the stream bed and banks, reduce erosion, and restore natural channel function. Stream banks will be regraded and stabilized with matting and native vegetation, and all in-stream work will be performed in accordance with erosion and sediment control requirements. Civil work includes site grading, demolition of the existing structure, installation of erosion and sediment controls, temporary stream diversion, and restoration of disturbed areas. The new bridge will be constructed to accom...
Related opportunities
- Multiple Trail Bridges Replacement Project Phase 2AGRICULTURE, DEPARTMENT OFCloses in 17 days
- Multiple Trail Bridges Replacement Project Phase 2AGRICULTURE, DEPARTMENT OFCloses in 17 days
- Multiple Trail Bridges Replacement Project Phase 2AGRICULTURE, DEPARTMENT OFCloses in 17 days
- Multiple Trail Bridges Replacement Project Phase 2AGRICULTURE, DEPARTMENT OFCloses in 17 days
- 2026028-BID3313 Savannah Rapids Pavilion Bank StabilizationColumbia County Board Of CommissionersCloses in 12 days
- Dam Safety Production Center - Huntington (DSPC-H) Industry DayDEPT OF DEFENSE