Chena River Lakes Flood Control Project - Floor Drain Disposal
DEPT OF DEFENSE
Place of performance: Fairbanks, AK
Free. Verify your email, then we send one reminder only.
- Posted
- Aug 15, 2026
- Closes
- Aug 24, 2026 (in 9 days)
Similar opportunities open now
- AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park EnhancementsOpenTRANSPORTATION, DEPARTMENT OFNo deadline listed
- Dam Safety Production Center - Huntington (DSPC-H) Industry DaySame funderOpenDEPT OF DEFENSENo deadline listed
- ACC002 Utilities and InfrastructureSame funderOpenDEPT OF DEFENSENo deadline listed
- RFP PH2026-03 Pump House DemolitionOpenDuluth, City OfCloses in 4 days
- Request for Information for PFAS Contaminated Soil Disposal ServicesSame funderOpenDEPT OF DEFENSENo deadline listed
At a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the all other miscellaneous waste management services category. The deadline is August 24, 2026, 10 days from now. Work is performed in Fairbanks, AK. This solicitation carries a Small Business Set Aside - Total set-aside.
Classification and identifiers
- Industry (NAICS)
- All Other Miscellaneous Waste Management Services (562998)
- Product or service (PSC)
- Other Housekeeping Services (S299)
- Solicitation number
- W911KB26QA012
- Contracting office
- W2SN ENDIST ALASKA
- Set-aside
- Small Business Set Aside - Total
Who can apply
Small businesses can apply here. Check the eligibility details below to see if your organization fits.
Small Business Set Aside - Total
About this opportunity
SEE AMENDMENT 001 ATTACHED The Chena River Lakes Flood Control Project (Chena Project) has one shop floor holding tank that is not connected to a leach field and must be pumped to be emptied. The holding tank water will either be pumped directly from the shop floor holding tank or from plastic totes situated in the shop next to the drain in a heated space. The holding tank contents will be pumped, transported, and disposed under this contract. The Chena Project is located 3800 Laurance Road, North Pole, Alaska, approximately 18 miles east of Fairbanks, Alaska. The Contractor shall furnish all labor, supervision, equipment, tools, parts and materials, as necessary, for the pumping and disposal of shop tank contents. Test results for the holding tank contents are shown in the Holding Tank Te...
Related opportunities
- AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park EnhancementsTRANSPORTATION, DEPARTMENT OF
- Dam Safety Production Center - Huntington (DSPC-H) Industry DaySame funderDEPT OF DEFENSE
- Dam Safety Production Center - Huntington (DSPC-H) Industry DaySame funderDEPT OF DEFENSE
- ACC002 Utilities and InfrastructureSame funderDEPT OF DEFENSE
- RFP PH2026-03 Pump House DemolitionDuluth, City OfCloses in 4 days
- Request for Information for PFAS Contaminated Soil Disposal ServicesSame funderDEPT OF DEFENSE