Modernize 6N Inpatient Restrooms (Swing for 3N)
VETERANS AFFAIRS, DEPARTMENT OF
Place of performance: Shreveport, LA
Free. Verify your email, then we send one reminder only.
- Posted
- Aug 19, 2026
- Closes
- Rolling, no fixed deadline
Similar opportunities open now
- Z1DA--Renovate Patient RestroomsSame funderOpenVETERANS AFFAIRS, DEPARTMENT OFNo deadline listed
- PN: 636A8-23-200, Update 9W Patient Safety Features (IC) - AP: 36C263-26-AP-1612 /Same funderOpenVETERANS AFFAIRS, DEPARTMENT OFNo deadline listed
- Z2DA--689-22-700 EHRM IU West Haven VAMC This ONLY for the PCAC VISN 1 Construction MATOC PoolSame funderOpenVETERANS AFFAIRS, DEPARTMENT OFNo deadline listed
- Z2DA--626-24-203 Cooling Tower and ChillersSame funderOpenVETERANS AFFAIRS, DEPARTMENT OFNo deadline listed
- Z2DA--589A7-23-306 Renovate Bldg. 5 & 5B for Mental Health FY27 NRMSame funderOpenVETERANS AFFAIRS, DEPARTMENT OFNo deadline listed
At a glance
This is a government contract opportunity posted by VETERANS AFFAIRS, DEPARTMENT OF in the commercial and institutional building construction category. Applications are accepted on a rolling basis. Work is performed in Shreveport, LA. This solicitation carries a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) set-aside.
Classification and identifiers
- Industry (NAICS)
- Commercial and Institutional Building Construction (236220)
- Product or service (PSC)
- Construction of Hospitals and Infirmaries (Y1DA)
- Solicitation number
- 36C25626R0108
- Contracting office
- 256-NETWORK CONTRACT OFFICE 16 (36C256)
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Who can apply
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
About this opportunity
The project requires replacing ten inpatient restroom Patient Care Units (PCUs) in the 6N ICU—currently equipped with combination swivette toilet, sink, and cabinet units—with VA-approved fixed toilet-sink-cabinet assemblies comparable to or better than the existing units on the 3N ICU. The contractor must furnish all labor, equipment, and materials, while ensuring continuous operation and safe access to adjacent occupied areas. Work planning should include phased construction to minimize disruption, and some tasks may need to be completed after hours or on weekends due to the sensitive location and nature of the work. The period of performance will be 180 calendar days from the Notice to Proceed.