Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems, Caserma Miotto, Longare, Vicenza, Italy.
DEPT OF DEFENSE
Free. Verify your email, then we send one reminder only.
- Posted
- Aug 20, 2026
- Closes
- Aug 28, 2026 (in 8 days)
Similar opportunities open now
- FY27 Secure Facilities Design-Build (DB) and Design-Bid-Build (DBB) Construction Multiple Award Task Order (MATOC)Same funderOpenDEPT OF DEFENSENo deadline listed
- Amendment 0001 - Installation of Equipment- 13 Water Bottle Filling (W91QF426BA010)OpenDEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.MISSION INSTALLATION CONTRACTING COMMAND.FDO EUSTIS.W6QM MICC-FT LEAVENWORTHCloses in 6 days
- Progressive Design-Build Services under Other Transaction Authority Project: Multi-Domain Cyber and Intel Operations Center, Joint Base San Antonio, Lackland AFB TexasSame funderOpenDEPT OF DEFENSENo deadline listed
At a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the water and sewer line and related structures construction category. The deadline is August 28, 2026, 9 days from now.
Classification and identifiers
- Industry (NAICS)
- Water and Sewer Line and Related Structures Construction (237110)
- Product or service (PSC)
- Repair or Alteration of Other Utilities (Z2NZ)
- Solicitation number
- W912PF26RA011
- Contracting office
- 0414 AQ HQ CONTRACT AUG
Who can apply
About this opportunity
19 August2026: The purpose of this amendment is to perform the following changes (additions are provided in blue font and deletions in red): 1. Distribute Government responses to Pre-Proposal Inquiries (PPI) received. 2. Revise solicitation in response to industry feedback received during the PPI submission period. 3. Incorporate the 100% design package. 4. Distribute the following attachments: B08-W912PF26RA011_ATT D_BIDSHEET_REV01 B08-W912PF26RA011_ATT01_SOW_REV01_20260818 B08-W912PF26RA011_ATT03_SOW_SEWER_100%.zip B08-W912PF26RA011_ATT04-05_SOW_STORM_100%.zip B08-W912PF26RA011_ATT07_PPI LOG_20260819 B08-W912PF26RA011_ATT08_THIRD_PARTY_AGENCY_PKGS B08-W912PF26RA011_ATT09_MOU_LICENSES B08-W912PF26RA011_ATT10_MODULO MU19 SIGNED.
Related opportunities
- FY27 Secure Facilities Design-Build (DB) and Design-Bid-Build (DBB) Construction Multiple Award Task Order (MATOC)Same funderDEPT OF DEFENSE
- Amendment 0001 - Installation of Equipment- 13 Water Bottle Filling (W91QF426BA010)DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.MISSION INSTALLATION CONTRACTING COMMAND.FDO EUSTIS.W6QM MICC-FT LEAVENWORTHCloses in 6 days
- Progressive Design-Build Services under Other Transaction Authority Project: Multi-Domain Cyber and Intel Operations Center, Joint Base San Antonio, Lackland AFB TexasSame funderDEPT OF DEFENSE
- Progressive Design-Build Services under Other Transaction Authority Project: Multi-Domain Cyber and Intel Operations Center, Joint Base San Antonio, Lackland AFB TexasSame funderDEPT OF DEFENSE
- Progressive Design-Build Services under Other Transaction Authority Project: Multi-Domain Cyber and Intel Operations Center, Joint Base San Antonio, Lackland AFB TexasSame funderDEPT OF DEFENSE
- Progressive Design-Build Services under Other Transaction Authority Project: Multi-Domain Cyber and Intel Operations Center, Joint Base San Antonio, Lackland AFB TexasSame funderDEPT OF DEFENSE