Tate County, Mississippi, Mississippi Delta Headwaters Project LD-23-01
DEPT OF DEFENSE
Free. Verify your email, then we send one reminder only.
- Posted
- Aug 21, 2026
- Closes
- Sep 8, 2026 (in 18 days)
Similar opportunities open now
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)Same funderOpenDEPT OF DEFENSECloses Feb 2027
- Chickasaw County, Mississippi, Mississippi Delta Headwaters Project, Bank Stabilization 23-01Same funderOpenDEPT OF DEFENSENo deadline listed
- Mississippi River, RM 488.5-L, FC/MR&T, Channel Improvement, Ben Lomond Dike 2C Extension, and Baleshed Landing Dike 6 RaiseSame funderOpenDEPT OF DEFENSENo deadline listed
- FY2025 IDIQ, Atchafalaya Basin, Gulf Intracoastal Waterway (GIWW) and Miscellaneous Projects Cutterhead DredgeSame funderOpenDEPT OF DEFENSECloses May 2028
At a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the other heavy and civil engineering construction category. The deadline is September 8, 2026, 19 days from now. This solicitation carries a SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15) set-aside.
Classification and identifiers
- Industry (NAICS)
- Other Heavy and Civil Engineering Construction (237990)
- Product or service (PSC)
- Construction of Other Non-Building Facilities (Y1PZ)
- Solicitation number
- W912EE26BA006
- Contracting office
- W07V ENDIST VICKSBURG
- Set-aside
- SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
Who can apply
SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)
About this opportunity
AMENDMENT 0001: SPECIFICATIONS: Sections 01 22 00.00 09 are revised.Specifications revised by this amendment have the notation Revised by Amendment 0001 at the bottom of the page. Text added by this amendment is shown as underlined. Text deleted by this amendment is shown as overstruck. W912EE - The United States Army Corps of Engineers, Vicksburg District, has issued an Invitation for Bids (IFB) Solicitation Number W912EE26BA006 for Tate County, Mississippi, Mississippi Delta Headwaters Project, LD-23-01.The work consists of furnishing all plant, labor, materials, and equipment, and constructing three (3) grade control structures, and Longitudinal Peaked Stone Toe Dikes with Tiebacks, in Tate County, Mississippi. Principle features of work for the grade control structures include clearing...
Related opportunities
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)Same funderDEPT OF DEFENSECloses Feb 2027
- Chickasaw County, Mississippi, Mississippi Delta Headwaters Project, Bank Stabilization 23-01Same funderDEPT OF DEFENSE
- Mississippi River, RM 488.5-L, FC/MR&T, Channel Improvement, Ben Lomond Dike 2C Extension, and Baleshed Landing Dike 6 RaiseSame funderDEPT OF DEFENSE
- FY2025 IDIQ, Atchafalaya Basin, Gulf Intracoastal Waterway (GIWW) and Miscellaneous Projects Cutterhead DredgeSame funderDEPT OF DEFENSECloses May 2028
- FY2025 IDIQ, Atchafalaya Basin, Gulf Intracoastal Waterway (GIWW) and Miscellaneous Projects Cutterhead DredgeSame funderDEPT OF DEFENSECloses in 40 days