Aberdeen Proving Ground Plumbing Repair
DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.ACC-CTRS.ACC-APG.W6QK ACC-APG DIR
Place of performance: Aberdeen Proving Ground, MD
Free. Verify your email, then we send one reminder only.
- Posted
- Aug 22, 2026
- Closes
- Aug 25, 2026 (in 3 days)
Similar opportunities open now
- Grant Pool Repairs Fort LeavenworthOpenDEPT OF DEFENSECloses in 4 days
- Fort Pickett 464, 465 Restoration Project 122346OpenDepartment of Military AffairsCloses in 12 days
- Repair Natural Resources Facility B3370OpenDEPT OF DEFENSECloses Apr 2029
- Residential Bathroom Renovation and Drainage UpgradesOpenSTATE, DEPARTMENT OFCloses in 17 days
- A&E 35% Design Repair Runway PDPG26-0103 March ARB, CAOpenDEPT OF DEFENSENo deadline listed
At a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the commercial and institutional building construction category. The deadline is August 25, 2026, 4 days from now. Work is performed in Aberdeen Proving Ground, MD. This solicitation carries a SBA set-aside.
Classification and identifiers
- Industry (NAICS)
- Commercial and Institutional Building Construction (236220)
- Product or service (PSC)
- Repair or Alteration of Miscellaneous Buildings (Z2JZ)
- Solicitation number
- PANAPG26052959
- Set-aside
- SBA
Who can apply
Small businesses can apply here. Check the eligibility details below to see if your organization fits.
Small Business Set Aside - Total
About this opportunity
The Government requires minor construction and facility restoration services for Building 4401 at Aberdeen Proving Ground. The requirement includes the demolition of existing tile and concrete flooring, wet-saw cutting of 205 linear feet of concrete, and trench excavation. This provides access to replace a failing cast iron main drain line and branch lines with new Schedule 40 PVC. Subsequent architectural restoration includes repouring the concrete subfloor, applying floor leveling thinset, and installing approximately 2,000 square feet of ceramic tile in a patterned design. The period of performance is 10 weeks (70 calendar days).