SOR Waterline Repair
DEPT OF DEFENSE
Place of performance: Kirtland AFB, NM
Free. Verify your email, then we send one reminder only.
- Posted
- Aug 25, 2026
- Closes
- Sep 17, 2026 (in 23 days)
At a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the water and sewer line and related structures construction category. The deadline is September 17, 2026, 24 days from now. Work is performed in Kirtland AFB, NM. This solicitation carries a Small Business Set Aside - Total set-aside.
Classification and identifiers
- Industry (NAICS)
- Water and Sewer Line and Related Structures Construction (237110)
- Product or service (PSC)
- Architect and Engineering- Construction: Water Supply Facilities (C1NE)
- Solicitation number
- FA940126R0023
- Contracting office
- FA9401 377 MSG PK
- Set-aside
- Small Business Set Aside - Total
Who can apply
Small businesses can apply here. Check the eligibility details below to see if your organization fits.
Small Business Set Aside - Total
About this opportunity
The primary purpose and objective of this project is to outline the scope for the design and construction of a new 7,900 feet high-pressure waterline, appurtenant systems, and associated control systems on the southeast side of KAFB. This project shall provide a robust and reliable water supply from Pump Station 2 (PS2) to the SOR and HERTF reservoirs, replacing and upgrading existing infrastructure. This includes an 8-inch, Class 350 Ductile Iron Pipe (DIP) with cement-mortar lining and an asphaltic seal coat and all associated valves and fittings, upgrade the existing control system to add SCADA to the newly installed system, Portable Hoist for Pump and Motor Maintenance, a new 15,000-gallon tank to include a booster pumps to be installed prior to the PS2, and a new 5,000-gallon tank and...