Sources Sought: T-38 Side Brace Trunnion Assembly (PN: 202607928)
DEPT OF DEFENSE
Free. Verify your email, then we send one reminder only.
- Posted
- Aug 25, 2026
- Closes
- No deadline published by the funder
Similar opportunities open now
- VALVE,LINEAR,DIRECT_End_Item_T-38_NSN_4810008648673HS_PN_3-43905-1Same funderOpenDEPT OF DEFENSENo deadline listed
- NOM: Manifold, Pneumatic; WSDC: [26F]/ END ITEM: F-16 Aircraft; PR: 7014545384 NSN: 6610-011491465: IAW P/Ns: 01281-0267-0001 & 2118070-1-1Same funderOpenDEPT OF DEFENSENo deadline listed
- NSN#: 1560-016826852, DESCRIPTION: SUPPORT,STRUCTURAL, WSDC: CXN, AIRCRAFT, OSPREY V- 22ASame funderOpenDEPT OF DEFENSENo deadline listed
- NOM: Controller, Engaging; WSDC: [EEN]/ END ITEM: E2/C2 All Series; PR: 7013431353 NSN: 6615-017054822: IAW P/Ns: 123AV91430-501 & 123SCAV101-9 & 1781327-5 ;Same funderOpenDEPT OF DEFENSENo deadline listed
- VANE SEGMENT, COMPRE_End_Item_F100_NSN_2840016197379NZ_PN_4089078-03Same funderOpenDEPT OF DEFENSENo deadline listed
At a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the other aircraft parts and auxiliary equipment manufacturing category.
Classification and identifiers
- Industry (NAICS)
- Other Aircraft Parts and Auxiliary Equipment Manufacturing (336413)
- Product or service (PSC)
- Aircraft Landing Gear Components (1620)
- Solicitation number
- SS_T38SideBraceTrunnion
- Contracting office
- FA8203 AFSC PZAAB
Who can apply
About this opportunity
1.0 Description / Background The Government is conducting market research to identify interested and capable sources for the manufacturing of the T-38 Side Brace Trunnion Assembly, Part Number (PN) 202607928. The T-38 side brace trunnion is a critical subcomponent of the aircraft's main landing gear. It serves as a primary structural support during landing and other operational loads, enabling the main landing gear to fully extend and retract. This part is specific to the T-38 aircraft operational envelope. Please note: A formal Technical Data Package (TDP) is not yet available, as the drawings are in the final stages of approval. Specific quantities and delivery schedules have not yet been determined. 2.0 Required Capabilities To be considered a capable source for this requirement, respon...