Government Owned Pre-Engineered Steel Building Erection
DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION SOUTHWESTERN.ENDIST FT WORTH.W076 ENDIST FT WORTH
Free. Verify your email, then we send one reminder only.
- Posted
- Aug 29, 2026
- Closes
- Sep 14, 2026 (in 16 days)
Similar opportunities open now
- Design-Build Maintenance and Repair of the General Stilwell Memorial Army Reserve Center (ARC) Training Building 1520, TXOpenDEPT OF DEFENSECloses in 2 days
- BUILD TWO(2) EQUIPMENT HAULING TRAILERSOpenHOMELAND SECURITY, DEPARTMENT OFCloses today
- SUPPLY AND INSTALLATION OF 80’ X 112’ TENT STRUCTUREOpenDEPT OF DEFENSE.DEPT OF THE ARMY.NATIONAL GUARD BUREAU.JFHQ USPFO WI.USPFO WI PROCUREMENT.W7N8 USPFO ACTIVITY WIANG CRTCCloses in 2 days
- SUPPLY AND INSTALLATION OF 80’ X 112’ TENT STRUCTUREOpenDEPT OF DEFENSECloses in 2 days
At a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the commercial and institutional building construction category. The deadline is September 14, 2026, 17 days from now. This solicitation carries a SBA set-aside.
Classification and identifiers
- Industry (NAICS)
- Commercial and Institutional Building Construction (236220)
- Product or service (PSC)
- Repair or Alteration of Office Buildings (Z2AA)
- Solicitation number
- W9126G26QA113
- Set-aside
- SBA
Who can apply
Small businesses can apply here. Check the eligibility details below to see if your organization fits.
Small Business Set Aside - Total
About this opportunity
SUBJECT: GOVERNMENT OWNED, PRE-ENGINEERED STEEL BUILDING ERECTION, GRANGER LAKE, TEXAS. SOLICITATION NUMBER: W9126G26QA113; SOLICITATION CLOSING DATE: 14 SEPTEMBER 2026. OFFERS DUE BY 10:00 AM CST. ---------- DESCRIPTION: The contractor shall furnish all tools, equipment, labor, and supervision to erect a Government furnished pre-engineered steel building as shown in Statement of Work (SOW) Attachment 2 and in accordance with SOW Section 13 34 19 METAL BUILDING SYSTEMS. Materials required for the complete erection of the pre-engineered steel building not listed in SOW Attachment 1 shall be furnished by the Contractor and submitted to the COR for approval. Prior to erection, Contractor shall examine the concrete foundation and masonry bearing surfaces, anchor bolt size and placement, survey...