Request for quotes for the installation and commissioning of one (1) 65KVA standby generator at a U.S. Government residential compound in Cape Town
STATE, DEPARTMENT OF
Place of performance: Cape Town, ZAF
Free. Verify your email, then we send one reminder only.
- Posted
- Sep 1, 2026
- Closes
- Sep 21, 2026 (in 20 days)
Similar opportunities open now
- Request for quotes for Preventive Maintenance services for Building Automation systemsSame funderOpenSTATE, DEPARTMENT OFCloses in 14 days
- INSTALLATION OF HIGH SPEC AUTOMATIC SLIDING GATES AND CONTROL SYSTEM UPGRADE, VEHICLE ACCESS POINTSSame funderOpenSTATE, DEPARTMENT OFCloses today
- Preventative Maintenance services for Building Automation SystemsSame funderOpenSTATE, DEPARTMENT OFNo deadline listed
- Expression of interest - PR16122610 – Building Automation System (BAS).Same funderOpenSTATE, DEPARTMENT OFNo deadline listed
- Lease of one (1) 500kW Diesel GeneratorOpenDEPT OF DEFENSECloses in 14 days
At a glance
This is a government contract opportunity posted by STATE, DEPARTMENT OF in the electrical contractors and other wiring installation contractors category. The deadline is September 21, 2026, 20 days from now. Work is performed in Cape Town, ZAF.
Classification and identifiers
- Industry (NAICS)
- Electrical Contractors and Other Wiring Installation Contractors (238210)
- Product or service (PSC)
- Installation of Equipment: Electric Wire, and Power and Distribution Equipment (N061)
- Solicitation number
- 19SF2026Q0021
- Contracting office
- AMERICAN CONSULATE CAPE TOWN
Who can apply
About this opportunity
1. General Summary of Services Required The U.S. Consulate General Cape Town invites qualified vendors to submit quotations for the installation and commissioning of one (1) 65KVA standby generator at a U.S. Government residential compound in Cape Town. The 65KVA generator will be supplied by the U.S. Consulate. The contractor shall provide all labor, supervision, materials, tools, equipment, transportation, crane services, safety requirements, and incidentals necessary to complete the installation in accordance with the attached Statement of Work – Installation of a 65KVA Generator. Work includes, but is not limited to: Establishing and maintaining a safe work site. Collection, transportation, positioning, and offloading of the Government-furnished 65KVA generator using a crane truck. Exc...