CherryLOCK G689 Rivet Kit
DEPT OF DEFENSE.DEPT OF THE AIR FORCE.AIR FORCE GLOBAL STRIKE COMMAND.FA4690 28 CONS PKC
Place of performance: Ellsworth AFB, SD
Free. Verify your email, then we send one reminder only.
- Posted
- Sep 1, 2026
- Closes
- Sep 14, 2026 (in 13 days)
Similar opportunities open now
- Swaging Tool KitOpenDEPT OF DEFENSECloses in 2 days
- HELICOPTER, APACHE GUARDIAN AH-64E; FAIRING, AIRCRAFTOpenDEPT OF DEFENSECloses Apr 2027
- Overhaul of Rotary Wing and Rotary Rudder BladesOpenHOMELAND SECURITY, DEPARTMENT OFCloses in 90 days
- Servovalve, HydraulicOpenDEPT OF DEFENSECloses in 17 days
- NRP, ROLLER SWAGING / NSN 1680-01-619-9211 / CV-22 AIRCRAFTOpenDEPT OF DEFENSENo deadline listed
At a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the power-driven handtool manufacturing category. The deadline is September 14, 2026, 13 days from now. Work is performed in Ellsworth AFB, SD. This solicitation carries a SBA set-aside.
Classification and identifiers
- Industry (NAICS)
- Power-Driven Handtool Manufacturing (333991)
- Product or service (PSC)
- Hand Tools, Power Driven (5130)
- Solicitation number
- FA469026Q0044
- Set-aside
- SBA
Who can apply
Small businesses can apply here. Check the eligibility details below to see if your organization fits.
Small Business Set Aside - Total
About this opportunity
The 28 Maintenance Squadron, Aircraft Structural Maintenance shop, requires the procurement of two (2) G689 CherryLock pneumatic-hydraulic riveter guns, two (2) 680B46 straight adapters, and two (2) of each of the following Cherry Pulling Heads: H9055-3, H9055-4, H9055-5, and H9055-6 IAW Attachmentr 1: Salient Characteristics. Basis for Award: The Government intends to award a single, Firm-Fixed-Price (FFP) contract to the offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. Technical and Price Factors that will be utilized. • Delivery: Required delivery is FOB Destination to Ellsworth AFB, SD, no later than 180 days after contract award. • Attachment: All information necessary to submit a quote is contained in ...