Commercial Grade Dust Collector System
DEPT OF DEFENSE
Free. Verify your email, then we send one reminder only.
- Posted
- Sep 1, 2026
- Closes
- Sep 7, 2026 (in 6 days)
Similar opportunities open now
- C26-032 Altitude Test Chamber Blower ReplacementSame funderOpenDEPT OF DEFENSENo deadline listed
- John Day Dam Powerhouse HVAC UpgradesSame funderOpenDEPT OF DEFENSENo deadline listed
- Lower Monumental PH HVAC System UpgradeSame funderOpenDEPT OF DEFENSECloses in 21 days
- Three Rivers RS Bldg# 2017 HVAC ReplacementOpenAGRICULTURE, DEPARTMENT OFNo deadline listed
- PKB Air Compressor AuditSame funderOpenDEPT OF DEFENSENo deadline listed
At a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the industrial and commercial fan and blower and air purification category. The deadline is September 7, 2026, 7 days from now. This solicitation carries a Small Business Set Aside - Total set-aside.
Classification and identifiers
- Industry (NAICS)
- Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing (333413)
- Product or service (PSC)
- Filters and Networks (5915)
- Solicitation number
- W911S226U4220
- Contracting office
- W6QM MICC-FT DRUM
- Set-aside
- Small Business Set Aside - Total
Who can apply
Small businesses can apply here. Check the eligibility details below to see if your organization fits.
Small Business Set Aside - Total
About this opportunity
Amendment 0002. Need to add: must include Puget Sound Clean Air Agency notice of construction permit. Because of this, extending the solicitation for a week. Amended to add set aside code. Shaker filter / baghouse style dust collection system capable of allowing multiple high-demand machines (belt sanders, CNC routers, planers, saws) to run simultaneously without starving the system of static pressure and provide 99.9% pure air return into facility. Must be able to retrofit into ductwork from a 2006 Murphy-Adams Shaker Style dust collection system (model MRSE-20-6D) for a 5,000 square foot facility. Installation, electrical components, and air compression (as needed) requested for inclusion in the total cost. CFM requirements based on attached ductwork schematic. Must meet federal and Wash...