Big Piney Office Interior Sewer Line Replacement
AGRICULTURE, DEPARTMENT OF.FOREST SERVICE.BRIDGER-TETON NATIONAL FOREST
Place of performance: Big Piney, WY
Free. Verify your email, then we send one reminder only.
- Posted
- Sep 2, 2026
- Closes
- Sep 14, 2026 (in 12 days)
Similar opportunities open now
- Replace Drain Field with Forced Septic LineOpenGENERAL SERVICES ADMINISTRATIONNo deadline listed
- WY NP YELL 15(2), Madison River BridgeOpenTRANSPORTATION, DEPARTMENT OFNo deadline listed
- WY MT NP MULTI PMS(1), Pavement Preservation Wyoming and MontanaOpenTRANSPORTATION, DEPARTMENT OFNo deadline listed
- WY NPS GRTE 2020(1), Moose Wilson Road Phase 2 and WY NP GRTE 11(1), Teton Park Road - Moose to Taggart Lake TrailheadOpenTRANSPORTATION, DEPARTMENT OFNo deadline listed
- WY NPS YELL 10(26), Gardner River High BridgeOpenTRANSPORTATION, DEPARTMENT OFNo deadline listed
At a glance
This is a government contract opportunity posted by AGRICULTURE, DEPARTMENT OF in the water and sewer line and related structures construction category. The deadline is September 14, 2026, 13 days from now. Work is performed in Big Piney, WY. This solicitation carries a SBA set-aside.
Classification and identifiers
- Industry (NAICS)
- Water and Sewer Line and Related Structures Construction (237110)
- Product or service (PSC)
- Construction of Sewage and Waste Facilities (Y1ND)
- Solicitation number
- 1240LT26Q0154
- Set-aside
- SBA
Who can apply
Small businesses can apply here. Check the eligibility details below to see if your organization fits.
Small Business Set Aside - Total
About this opportunity
This project consists of replacement of the sewer line and related repair work on the Big 1.2 Piney Ranger Station on the Bridger-Teton National Forest (NF). The facility is operated by the Bridger-Teton NF on the Big Piney Ranger District in Big Piney, Wyoming. Work will include demolition of finished flooring as needed, demolition of concrete slab along 81’ of sewer line, disconnection of 17 plumbing fixtures, replacement of sewer line, patching of concrete slab and replacement of aggregate, reconnection of 17 plumbing fixtures, and replacement of finished flooring. Work includes the removal and proper disposal of all demolished materials. The contractor shall provide all required materials. Quotes should describe the method that will be used to replace the sewer line, and what areas wil...