Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile 17.0, Including Beneficial Use Within CWPPRA Sabine Cycle 6 Marsh Creation Areas, Calcasieu and Cameron Parishes, LA ED 23-024
DEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION MISSISSIPPI VALLEY.ENDIST NEW ORLEANS.W07V ENDIST NEW ORLEANS
Free. Verify your email, then we send one reminder only.
- Posted
- Sep 3, 2026
- Closes
- Sep 18, 2026 (tomorrow)
Similar opportunities open now
- Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile 17.0, Calcasieu and Cameron Parishes, LAOpenDEPT OF DEFENSECloses Jun 2028
- Calcasieu River and Pass, LA, Dredged Material Management Plan (DMMP), CDF-12A Degrading, Calcasieu Parish, LAOpenDEPT OF DEFENSENo deadline listed
- Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM26011)OpenDEPT OF DEFENSECloses Apr 2028
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)OpenDEPT OF DEFENSECloses Feb 2027
- Calcasieu River and Pass, Bar Channel Hopper Dredge Contract No. 1-2025, Cameron Parish, Louisiana. Specification Nos. OM25125OpenDEPT OF DEFENSECloses in 78 days
At a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the other heavy and civil engineering construction category. The deadline is September 18, 2026, 1 day from now.
Classification and identifiers
- Industry (NAICS)
- Other Heavy and Civil Engineering Construction (237990)
- Product or service (PSC)
- Construction of Dredging Facilities (Y1KF)
- Solicitation number
- W912P826BA023
Who can apply
About this opportunity
THIS SOLICITATION IS ISSUED AS UNRESTRICTED. THE NAICS CODE FOR THIS PROCUREMENT IS 237990. THE MAGNITUDE OF CONSTRUCTION IS BETWEEN $25,000,000 AND $100,000,000. THE WORK CONSISTS OF REMOVAL OF MATERIAL FROM WITHIN THE CALCASIEU RIVER SHIP CHANNEL AND SATISFACTORY DISPOSAL WITHIN THE DESIGNATED MARSH CREATION AREAS WITHIN THE SABINE NATIONAL WILDLIFE REFUGE AND ADJACENT TO THE CALCASIEU RIVER AND PASS; ALL AS SHOWN ON THE DRAWINGS. REMOVAL OF MATERIAL FROM WITHIN DEVIL’S ELBOW IS INCLUDED AS OPTIONAL WORK. THE WORK ALSO INCLUDES RETENTION DIKE CONSTRUCTION, SURVEYS, AND OPTIONAL DITCHING AND DRAINING OF DISPOSAL AREAS, AND ALL OPERATIONS INCIDENTAL THERETO. (THE ESTIMATED TIME OF COMPLETION IS 300 CALENDAR DAYS FOR BASE WORK AFTER RECEIPT OF NOTICE TO PROCEED. THE SOLICITATION WILL INCLUD...