Palm Beach Harbor, South Jetty Rehabilitation 2026, Palm Beach County, Florida
DEPT OF DEFENSE
Want a reminder before this closes?
We'll email you 3 days before the deadline. One email, then we stop.
Free. Verify your email, then we send one reminder only.
- Posted
- Sep 10, 2026
- Responses due
- Oct 23, 2026
Similar opportunities open now
- FY2025 IDIQ, Atchafalaya Basin, Gulf Intracoastal Waterway (GIWW) and Miscellaneous Projects Cutterhead DredgeSame funderOpenDEPT OF DEFENSECloses May 2028
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)Same funderOpenDEPT OF DEFENSECloses Feb 2027
See more open contract opportunities like this
Get new bids for the work you do
Choose your keywords and state, then confirm a weekly email alert.
Choose my bid alertAt a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the other heavy and civil engineering construction category. The deadline is October 23, 2026, 15 days from now.
Classification and identifiers
- Industry (NAICS)
- Other Heavy and Civil Engineering Construction (237990)
- Product or service (PSC)
- Repair or Alteration of Dredging Facilities (Z2KF)
- Solicitation number
- W912EP26BA019
- Contracting office
- W074 ENDIST JACKSNVLLE
Who can apply
About this opportunity
The work consists of rehabilitation of the South Jetty at Palm Beach Harbor. Rehabilitation will require substantial moving and manipulation of both new and existing stones to obtain the required interlocking within the tolerances provided. Mobilization of equipment and the construction necessary to repair the jetty must be water-based and require the use of marine construction methods and equipment. Work on top of the jetty will be permitted. Land-based access to the project site will not be permitted. Rehabilitation also consists of concrete repairs to the South Jetty at Palm Beach Harbor as indicated on the drawings. Prior to work on the jetty, conduct a pre-construction benthic community survey on the jetty structure and any adjacent submerged areas that may be impacted by the Contract...