FY 2027 Park Street Drainage Repair Project
Walnut Grove, City Of
Free. Verify your email, then we send one reminder only.
- Posted
- Sep 12, 2026
- Closes
- Oct 14, 2026 (in 31 days)
Similar opportunities open now
- POOLER PARKWAY AT BENTON BOULEVARD, MILL CREEK CIRCLE, AND I-95 SOUTHBOUND RAMPS POOLER.OpenPooler, City OfCloses in 24 days
- Metts Road Drainage & Repairs ProjectOpenBulloch County Board Of CommissionersCloses in 5 days
- Western Corridor Sanitary Sewer ImprovementsOpenCumming, City OfCloses in 4 days
- SB011-27 822 Leonard Court Sinkhole RepairOpenLawrenceville, City OfCloses in 18 days
- SB009-27 Ezzard Street Pavement Rehabilitation ProjectOpenLawrenceville, City OfCloses in 11 days
About this opportunity
1.Replacement of CMP culvert under Industrial Parkway a.Contractor will follow GDOT specifications to replace a damaged culvert under Industrial Pkwy. b.Contractor must use RCP and the culvert size will be increased to 30¿ c.Culvert will be placed on a minimum of 12¿ of foundation backfill. d.Culvert will receive GDOT Safety Flared End Sections e.Head and tail ditch to be excavated to match new culvert f.Culvert to be relocated 2¿ further away from the edge of Park Street. g.Culvert to be backfilled with 57 stone and or compacted GAB within 6¿ of finished grade. Final 6¿ to be paved, following GDOT 1401 detail. h.Industrial Pkwy may be closed to traffic during culvert replacement for up to 3days. i.City will assist with Walton EMC coordination. j.Contractor must call 811 and coordinate any...