UOSA IFB 27-01 GAC Treatment Optimization
Upper Occoquan Service Authority
Want a reminder before this closes?
We'll email you 3 days before the deadline. One email, then we stop.
Free. Verify your email, then we send one reminder only.
- Posted
- Sep 29, 2026
- Closes
- Oct 6, 2026
Similar opportunities open now
- UOSA IFB 27-02 P2NR+ ConstructionSame funderOpenUpper Occoquan Service AuthorityCloses Oct 22, 2026 (in 22 days)
- Lower Monumental PH HVAC System UpgradeOpenDEPT OF DEFENSE.DEPT OF THE ARMY.US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTHWESTERN.ENDIST WALLA WALLA.US ARMY ENGINEER DISTRICT WALLA WALCloses Oct 5, 2026
- AWTP Filter Underdrain ReplacementOpenMacon Water AuthorityCloses Oct 27, 2026 (in 27 days)
- Request for Information RFI#408277 Regional GAC Facility Public-Private PartnershipOpenHampton Roads Sanitation DistrictCloses Sep 30, 2026
- B450 Fire Suppression System InstallationOpenDEPT OF DEFENSECloses Oct 8, 2026
About this opportunity
Phase 1 of the GAC Treatment Optimization Project includes, but is not limited to, retrofitting one L/2 Building carbon contactor, consisting of two cells, to serve as the per- and polyfluoroalkyl substances (PFAS) pilot study system; restoring upflow and downflow operating capability through modifications to the existing underdrain nozzle system; and implementing a proof-of-concept evaluation for carbon transfer improvements. If authorized by the Owner, Phase 2 of the Project will include, but is not limited to, retrofitting the remaining seven carbon contactors (i.e., fourteen cells) with the selected improvements based on the results of Phase 1. A complete description of the Work can be found in the Contract Documents.