Replace Roof Blackwater Building at Tidewater Community College, Virginia Beach Campus, PC# 260-B4260-013 (M24TC180)
Virginia Community College System - System Office
Want a reminder before this closes?
We'll email you 3 days before the deadline. One email, then we stop.
Free. Verify your email, then we send one reminder only.
- Posted
- Nov 10, 2026
- Closes
- Dec 10, 2026 (in 29 days)
- Last verified
- Nov 11, 2026
Similar opportunities open now
- ATC Replace Chilled Water Central Plant at Tidewater Community College, Virginia Beach Campus, PC#260-B4260-112-c (M26TC127)Same funderOpenVirginia Community College System - System OfficeCloses Nov 19, 2026
- Renovate Bathrooms for ADA Compliance at Rappahannock Community College, Glenns and Warsaw Campuses, PC#260-B6260-029 (M24RC127)Same funderOpenVirginia Community College System - System OfficeCloses Nov 12, 2026
- Replace Grayson Hall Elevator and Loading Dock at Wytheville Community College, Project Code# 260-B5260-075 (M25WC153)Same funderOpenVirginia Community College System - System OfficeCloses Nov 12, 2026
- ATC Replace Chilled Water Central Plant at Tidewater Community College, Virginia Beach Campus, PC#260-B4260-112-c (M26TC127)OpenBuyer shown on BidNet Direct (listed under Virginia)Closes Nov 19, 2026
- Access Control Improvements at Piedmont Virginia Community College, Multiple Campuses, PC# 260-B4260-021 (M23PV158)Same funderOpenVirginia Community College System - System OfficeCloses Nov 19, 2026
See more open contract opportunities like this
Get new bids for the work you do
Choose your keywords and state, then confirm a weekly email alert.
Choose my bid alertAbout this opportunity
Sealed bids are invited for the construction of the Replacement Roof of the Blackwater Building project at Tidewater Community College, Virginia Beach Campus, Project Code # 260-B4260-013 (M24TC180) located in Virginia Beach, Virginia. The project is generally described as the replacement of the roof membrane on the Blackwater Building. The existing system is a damaged 2-ply modified bitumen roof membrane. The 2-ply membrane and the installed coverboard will be removed. The existing insulation will remain, be reused, and new coverboard installed with a new fully adhered EPDM membrane. Full depth replacement of insulation will occur in select areas where moisture has infiltrated the roof as shown on the drawings. New edge metal will be installed around the perimeter of the roof area. Sealed...