Skip to content
ClosedNo longer accepting applications

GFO-23-309 - Virtual Power Plant Approaches for Demand Flexibility (VPP-FLEX)

CA Energy Commission

About this archived opportunity

The purpose of this solicitation is to fund demonstrations of community-based virtual power plant (VPP) approaches and demonstrations of innovative energy management systems (EMS) in commercial buildings with the goal of increasing demand flexibility. Demand flexibility refers to comprehensive programs and strategies that align electricity consumption with dynamic grid conditions. These can include both event-based demand response (DR) and load shifting strategies. Accelerating demand flexibility is a key strategy for California to reduce greenhouse gas emissions and meet the state’s climate and clean energy goals reliably and affordably. VPPs are portfolios of distributed energy resources (DERs) such as smart thermostats, rooftop solar photovoltaics, electric vehicles (EVs), batteries, and smart water heaters that are actively controlled by software to benefit the power system, consumers, and the environment. While these resources have the potential to meet grid needs as reliably as conventional alternatives such as gas-fired generators, their advantages extend further, offering greater affordability and substantial decarbonization benefits.[3] However, research and development of both technologies and business models is needed to fully capitalize on and understand VPPs’ potential, especially the systems that feature predictive controls and require minimal consumer engagement. The examples of predictive controls relevant to this research include, but are not limited to, the use of artificial intelligence or model predictive controls for EV load shifting or building pre-cooling applications. Projects will be funded in two groups. Group 1: Virtual Power Plants: Demonstrations that showcase community-based demand flexibility programs as a long-term (10 or more years) grid resource. Project teams must partner with local governments or non-profits to facilitate customer participation and smart device installations. Projects must evaluate the benefits and cost-effectiveness of community-based VPP approaches that use state-of-the-art DER management software (DERMS). · Group 2: Commercial Building Energy Management in Low-Income or Disadvantaged Communities: Demonstrations of innovative EMS in commercial buildings focused on specific characteristics such as interoperability and adherence to open-source standards. Demonstrations require participation in electric investor-owned utility (IOU) or third-party DR programs and partnerships with device and original equipment manufacturers (OEMs). These projects must showcase the latest advancements in energy management in the commercial sector and ensure technology adaptability, efficiency, and collaboration within the broader energy landscape.

Historical details

Status
Closed
Deadline
July 1, 2024
First captured
March 14, 2026
Award
$21,000,000
Publisher reference
59790

Eligibility: This solicitation is open to all public and private entities with the exception of local publicly owned electric utilities.

This opportunity has closed

GFO-23-309 - Virtual Power Plant Approaches for Demand Flexibility (VPP-FLEX)

by CA Energy Commission

Get notified when similar opportunities open

We'll save this search and email you when new virtual, power, plant opportunities are posted. Free.

Refine this search