Open·Ingested 12 days ago, not re-verified since
The construction of a concrete box beam bridge on S.R. 205 over overflow (L.M. 2.34) and a concrete Bulb-Tee beam bridge on S.R. 205 over the Wolf River (L.M. 2.51), including grading, drainage, and paving
Tennessee
View the solicitation
Free. Verify your email, then we send one reminder only.
- Posted
- Jul 21, 2026
- Closes
- Aug 14, 2026 (in 12 days)
Similar opportunities open now
- The repair of the bridges on S.R. 127 over Bradley Creek at L.M. 6.21 and L.M. 9.76, including grading, drainage, and paving.OpenTennesseeCloses in 12 days
- The grading, drainage, and paving on the I-26 bridges over the Nolichucky River (L.M. 11.72) (MM 39.44).OpenTennesseeCloses in 12 days
- The repair of the bridge on S.R. 60 over the Tennessee River (L.M. 3.10).OpenTennesseeCloses in 12 days
- The intersection improvements on S.R. 131 at Harrell Road/Carpenter Road (L.M. 9.5), including grading, drainage, signals, and paving.OpenTennesseeCloses in 12 days
- The grading, drainage, lighting, and paving on I-24 at the S.R. 50 interchange (L.M. 0.56) (Exit 127).OpenTennesseeCloses in 12 days
About this opportunity
Solicitation title: The construction of a concrete box beam bridge on S.R. 205 over overflow (L.M. 2.34) and a concrete Bulb-Tee beam bridge on S.R. 205 over the Wolf River (L.M. 2.51), including grading, drainage, and paving. Location: Tennessee. Published: 2026-07-20. Closing date: 2026-08-14. BidNet Direct lists open solicitations from public agencies. Visit the detail page for scope, required documents, and submission instructions.
Related opportunities
- The repair of the bridges on S.R. 127 over Bradley Creek at L.M. 6.21 and L.M. 9.76, including grading, drainage, and paving.TennesseeCloses in 12 days
- The grading, drainage, and paving on the I-26 bridges over the Nolichucky River (L.M. 11.72) (MM 39.44).TennesseeCloses in 12 days
- The repair of the bridge on S.R. 60 over the Tennessee River (L.M. 3.10).TennesseeCloses in 12 days
- The intersection improvements on S.R. 131 at Harrell Road/Carpenter Road (L.M. 9.5), including grading, drainage, signals, and paving.TennesseeCloses in 12 days
- The grading, drainage, lighting, and paving on I-24 at the S.R. 50 interchange (L.M. 0.56) (Exit 127).TennesseeCloses in 12 days
- The repair of the bridges on I-26 over Fordtown Road (L.M. 8.93).TennesseeCloses in 12 days