Open·Ingested 12 days ago, not re-verified since
The grading, drainage, and paving on the I-26 bridges over the Nolichucky River (L.M. 11.72) (MM 39.44).
Tennessee
View the solicitation
Free. Verify your email, then we send one reminder only.
- Posted
- Jul 21, 2026
- Closes
- Aug 14, 2026 (in 12 days)
Similar opportunities open now
- The grading, drainage, lighting, and paving on I-24 at the S.R. 50 interchange (L.M. 0.56) (Exit 127).OpenTennesseeCloses in 12 days
- The repair of the bridges on I-26 over Fordtown Road (L.M. 8.93).OpenTennesseeCloses in 12 days
- The repair of the bridges on S.R. 127 over Bradley Creek at L.M. 6.21 and L.M. 9.76, including grading, drainage, and paving.OpenTennesseeCloses in 12 days
- The grading, drainage, and paving on U.S. 127 (S.R. 28) from near Hollow Lane to near Lowe Road (L.M. 26.13 - L.M. 29.18).OpenTennesseeCloses in 12 days
- The construction of a concrete box beam bridge on S.R. 205 over overflow (L.M. 2.34) and a concrete Bulb-Tee beam bridge on S.R. 205 over the Wolf River (L.M. 2.51), including grading, drainage, and pavingOpenTennesseeCloses in 12 days
About this opportunity
Solicitation title: The grading, drainage, and paving on the I-26 bridges over the Nolichucky River (L.M. 11.72) (MM 39.44).. Location: Tennessee. Published: 2026-07-20. Closing date: 2026-08-14. BidNet Direct lists open solicitations from public agencies. Visit the detail page for scope, required documents, and submission instructions.
Related opportunities
- The grading, drainage, lighting, and paving on I-24 at the S.R. 50 interchange (L.M. 0.56) (Exit 127).TennesseeCloses in 12 days
- The repair of the bridges on I-26 over Fordtown Road (L.M. 8.93).TennesseeCloses in 12 days
- The repair of the bridges on S.R. 127 over Bradley Creek at L.M. 6.21 and L.M. 9.76, including grading, drainage, and paving.TennesseeCloses in 12 days
- The grading, drainage, and paving on U.S. 127 (S.R. 28) from near Hollow Lane to near Lowe Road (L.M. 26.13 - L.M. 29.18).TennesseeCloses in 12 days
- The construction of a concrete box beam bridge on S.R. 205 over overflow (L.M. 2.34) and a concrete Bulb-Tee beam bridge on S.R. 205 over the Wolf River (L.M. 2.51), including grading, drainage, and pavingTennesseeCloses in 12 days
- The repair of the bridge on S.R. 60 over the Tennessee River (L.M. 3.10).TennesseeCloses in 12 days