A brief summary of the scope is provided below. For complete details please download the Statement of Work attached to this notice. The LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope). Scope Overview of the Supply Structure The LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW � Vacuum Jacketed Pump Valve Box � MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply) � Instrumentation � Isolation Valves � Pressure Safety Valves � Cryogenic Equipment Protection (Platforms, Ladders and Supports
Historical details
- Status
- Closed
- Deadline
- January 23, 2026
- First captured
- January 11, 2026
- Publisher reference
- 4d5a3c135fb1462d8e67731e57894a57
This opportunity has closed
LBNF Liquid Argon LAr Circulation Equipment
by ENERGY, DEPARTMENT OF
Get notified when similar opportunities open
We'll save this search and email you when new liquid, argon, circulation opportunities are posted. Free.
Related opportunities
- Argon Piping Supply, Installation and TestingENERGY, DEPARTMENT OFCloses in 8 days
- Argon Piping Supply, Installation and TestingENERGY, DEPARTMENT OFCloses in 8 days
- Next Gen High Pressure Cold Spray SystemDEPT OF DEFENSECloses in 4 days
- VACUUM PUMP UNITDEPT OF DEFENSECloses in 19 days
- Liquid Nitrogen at Point Mugu, CADEPT OF DEFENSE
- Sources Sought- Hall C A/C ReplacementENERGY, DEPARTMENT OFCloses in 4 days