Lagoon Aeration
AGRICULTURE, DEPARTMENT OF
Place of performance: Mammoth Cave, KY
Free. Verify your email, then we send one reminder only.
- Posted
- Jan 11, 2026
- Amount
- $25,000 - $100,000
- Closes
- Nov 19, 2028 (in 811 days)
Similar opportunities open now
- PRESOLICITATION NOTICE FOR LAKE GEORGE EAST PHASE II DREDGING, EAST CHICAGO, LAKE COUNTY, ILLINOISOpenDEPT OF DEFENSENo deadline listed
- John Day Dam Turbine Replacement and Generator Rewind (TRGR)OpenDEPT OF DEFENSENo deadline listed
- Presolicitation Notice for Tom Jenkins Dam, Stilling Basin Concrete Repair, Glouster, OhioOpenDEPT OF DEFENSENo deadline listed
- USDA Forest Service Ninemile Ranger District Janitorial ServicesSame funderOpenAGRICULTURE, DEPARTMENT OFCloses Dec 2026
- USDA Forest Service Wildfire & All-Hazard Incident Sources SoughtSame funderOpenAGRICULTURE, DEPARTMENT OFCloses Oct 2027
At a glance
This is a government contract opportunity posted by AGRICULTURE, DEPARTMENT OF in the sewage treatment facilities category. The estimated value is $25,000 - $100,000. The deadline is November 19, 2028, 812 days from now. Work is performed in Mammoth Cave, KY. This solicitation carries a Total Small Business Set-Aside (FAR 19.5) set-aside.
Classification and identifiers
- Industry (NAICS)
- Sewage Treatment Facilities (221320)
- Product or service (PSC)
- Quality Control Services: Water Purification and Sewage Treatment Equipment (H146)
- Solicitation number
- 1141206
- Contracting office
- USDA FOREST SERVICE-SPOC EAST
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
Amount
$25,000 - $100,000
Who can apply
Small businesses can apply here. Check the eligibility details below to see if your organization fits.
Total Small Business Set-Aside (FAR 19.5). SBA
About this opportunity
Work for this project requires the contractor to be responsible for for furnishing and supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized in the SOW: 1. Furnish and install 480V, 3 PH, 30A feeder from existing panelboard to proposed aeration equipment disconnect. 2. Furnish and install 480V, 3PH, 30A disconnect, including grounding system, post, pipe bollards, and conduits. 3. Furnish and install microbubble lagoon aeration system consisting of the following: a. Control panel with individual motor overload protection circuit breakers. b. Self-contained floating microbubble aerators cord connected to control panel with tethers and anchors (4 each). 4. Locate private and utility owned buried...