Lagoon Aeration
AGRICULTURE, DEPARTMENT OF
Who can apply
Total Small Business Set-Aside (FAR 19.5). SBA
About this opportunity
Work for this project requires the contractor to be responsible for for furnishing and supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized in the SOW: 1. Furnish and install 480V, 3 PH, 30A feeder from existing panelboard to proposed aeration equipment disconnect. 2. Furnish and install 480V, 3PH, 30A disconnect, including grounding system, post, pipe bollards, and conduits. 3. Furnish and install microbubble lagoon aeration system consisting of the following: a. Control panel with individual motor overload protection circuit breakers. b. Self-contained floating microbubble aerators cord connected to control panel with tethers and anchors (4 each). 4. Locate private and utility owned buried...