LIFT STATION REDESIGN B20128
DEPT OF DEFENSE
Who can apply
Total Small Business Set-Aside (FAR 19.5). SBA
About this opportunity
The Contractor shall provide all the tools, parts, materials, equipment, labor, transportation, startup, and training for a redesigned lift station to the Commodities Maintenance Group (CMXG) at Robins Air Force Base (AFB), Georgia. These lift stations will be used to transport liquid chemical waste that could present environmental danger (i.e. acid waste, chrome waste). Each Lift Station shall have the following features: � Two (2) electric pumps made of CPVC or 316 Stainless Steel. Pump fittings must be CPVC with a two (2) inch maximum nominal size. The pump flowrate should be 25 gallons per minute per pump. The pump must have a 30-foot total dynamic head. � The tank material shall be polypropylene, with a volume of 50 to 75 gallons and a single tank containment style. � The dimensions o...