Skip to content
ClosedNo longer accepting applications

Crawlspace Water Mitigation - Piegan LPOE-Babb

GENERAL SERVICES ADMINISTRATION

This opportunity closed July 10, 2026. 3 similar opportunities are open right now.

Get alerted when new contract opportunities like this open.

Checking your account…

Free. Everyone sees new listings after 10 days. Unsubscribe anytime.

About this archived opportunity

The Piegan LPOE Port has water accumulation under the main port building that needs to be mitigated. This will be accomplished by the installation of French drain system around the perimeter of the building foundation footings. French drains once installed will empty into contractor supplied sump pumps to collect water to be pumped out into the storm drain system. A new vapor barrier will be installed to damper any ground source water evaporation from occurring under the building.

Historical details

Status
Closed
Deadline
July 10, 2026
First captured
June 19, 2026
Publisher reference
fdf88e9ccd784eb884c6465c589dca2d

Eligibility: Total Small Business Set-Aside (FAR 19.5). SBA

This opportunity has closed

Crawlspace Water Mitigation - Piegan LPOE-Babb

by GENERAL SERVICES ADMINISTRATION

Get notified when similar opportunities open

We'll save this search and email you when new crawlspace, water, mitigation opportunities are posted. Free.

Refine this search