OpenDue July 10, 2026·Updated June 19, 2026
Crawlspace Water Mitigation - Piegan LPOE-Babb
GENERAL SERVICES ADMINISTRATION
Who can apply
Small business
Total Small Business Set-Aside (FAR 19.5). SBA
About this opportunity
The Piegan LPOE Port has water accumulation under the main port building that needs to be mitigated. This will be accomplished by the installation of French drain system around the perimeter of the building foundation footings. French drains once installed will empty into contractor supplied sump pumps to collect water to be pumped out into the storm drain system. A new vapor barrier will be installed to damper any ground source water evaporation from occurring under the building.
Finding similar opportunities...