Skip to content
OpenDue July 1, 2026·Synced from source June 28, 2026

USCGC MUNRO GAS TURBINE BLEED AIR HOSE INSULATION

HOMELAND SECURITY, DEPARTMENT OF.US COAST GUARD.SFLC PROCUREMENT BRANCH 2(00085)

Who can apply

8(a) Business

8(a) Set-Aside (FAR 19.8)

About this opportunity

Mofification 1 to this solicitation was to correct the POP in the attached SOW. Correct: period of performance for this contract shall be between 01JUL2026 & 15JUL26. STATEMENT OF WORK (SOW) FOR GAS TURBINE BLEED AIR HOSE INSULATION CGC MUNRO has a need to replace insulation covers on the Gas Turbine Bleed Air Hose. The ship’s Main Gas Turbine is currently non-operational and has an immediate need for new insulation materials as outlined in this Statement of Work (SOW). 1.0 GENERAL Background USCGC MUNRO inadvertently soaked the insulation surrounding GTBA-HOSE-1 with an oily water. The hose is for the anti-icing bleed air system located underneath the Main Gas Turbine Module. Inundated insulation causes smoking when the Gas Turbine is operated in external temperatures above 40 degrees; pr...

Finding similar opportunities...