ClosedNo longer accepting applications
MT PRAIRIE 2016(3), Milwaukee Bridge Resurfacing and Rehabilitation
TRANSPORTATION, DEPARTMENT OF
This opportunity closed August 4, 2026. 5 similar opportunities are open right now.
Similar opportunities open now
- Removal of the existing three span multi-beam bridge, replacement with a new single span PPC deck beam bridge supported by concrete abutments at each end on Steel H-piles, new bridge railing, aggregateOpenIllinoisCloses in 2 days
- GPC - Replace Trail Bridges Phase 2OpenWisconsinCloses in 22 days
- Tecumseh Avenue, Lagoon Du Nord Bridge B-13-0906OpenWisconsinCloses in 21 days
- 18th Ave S bridge over Midtown Greenway Bridge ReconstructionOpenMinnesotaCloses in 15 days
- Multi-Use Path bridge deck replacement to include: TREATED TIMBER - 9035 FBM; TREATED DECK REMOVAL - 1 LSUM; HARDWARE - 3677 LBS; PROTECTIVE SHIELD - 237 SY; RAILROAD PROTECTIVE LIABILITY INSURANCE - 1OpenIllinoisCloses in 9 days
About this archived opportunity
Update 07/10/2026: Amendment A001.pdf posted to attachments Update 07/07/2026: QandA_07-07-2026.pdf posted to attachments Update 07/02/2026: QandA_07-02-2026.pdf posted to attachments Solicitation for contruction project, MT PRAIRIE 2016(3), Milwaukee Bridge Resurfacing and Replacement The Invitation for Bid (IFB), Plans, Physical Data, and the Construction Contract Administration Document per FAR 36.101-4 are posted under attachments.
Historical details
- Status
- Closed
- Deadline
- August 4, 2026
- First captured
- July 11, 2026
- Publisher reference
- 12589f80aac64fd1b0fb9489ba00f6e2
Free. One email, sent if this program reopens or a close match to it opens. We watch for 12 months, then stop. No list.