Local Highway Safety Improvement Program (HSIP)
U.S. Department of Transportation
Free. Verify your email, then we send one reminder only.
- Posted
- Jul 13, 2026
- Amount
- $100,000 to $10 million per project; $10 million BCR cap per agency
- Cycle 13 application deadline
- Nov 2, 2026 (in 67 days)
Similar opportunities open now
- Highway Safety ProgramsOpenDepartment of TransportationNo deadline listed
- Hazard Mitigation Grant ProgramOpenGovernor's Office of Emergency ServicesNo deadline listedUp to $210.1M
- Permanent Local Housing Allocation/ 2024 PLHA NOFAOpenDepartment of Housing and Community DevelopmentCloses Feb 2027
- Fiscal Year 2026 United States Marine Highway Program (USMHP)OpenMaritime AdministrationCloses in 4 daysUp to $12M
- Permanent Local Housing Allocation/ 2022 PLHA NOFAOpenDepartment of Housing and Community DevelopmentCloses Feb 2027Up to $335M
FundingLandscape analysis
California Local Highway Safety Improvement Program Cycle 13
Submit the completed dynamic application form and its embedded attachments through the Caltrans Smartsheet ticket process by the official November 2, 2026 cutoff. The source pages do not identify a time zone, so do not convert the stored database timestamp into a precise local deadline. Request a ticket for each application, upload the final validated file from the ticket email, submit the update, and retain the confirmation. Contact the District Local Assistance Engineer before the deadline if the agency needs a controlling clock or fatal-flaw clarification.
Primary sources verified 2026-08-16.
Why it matters
Caltrans estimates $370 million for Cycle 13. That is the total cycle pot, not one award. Chapter 9 sets a separate $100,000 minimum and $10 million maximum HSIP reimbursement for a single project. The Cycle 13 instructions also use $10 million as the aggregate maximum one agency may receive across its selected benefit-cost-ratio applications.
The instructions divide the cycle into a $306 million benefit-cost-ratio pool and five set-asides described as approximately $64 million. The five listed set-aside amounts sum to $63.9 million and may be adjusted based on applications, but total set-asides may not exceed $92 million or 25% of Cycle 13 funds.
This is reimbursement funding. The portal summarizes a 10% match, but the controlling Chapter 9 guidance says a project maximum reimbursement ratio may be 100%, 90%, or 50% by countermeasure and that the lowest ratio applies when a project combines countermeasures with different ratios. The actual ratio is established during implementation authorization.
A legally eligible road agency is not automatically application-ready. Cycle 13 requires a current Local Roadway Safety Plan or accepted equivalent, delivery standing without the specified unresolved delayed projects, a route-specific HSIP Analyzer, a responsible-charge engineer checklist, project and crash evidence, and a validated dynamic PDF package.
Official sources publish different selection timing. The August 7 Q&A document from the July 21 webinar says Cycle 13 projects will be awarded in March or April 2027, while the California Grants Portal lists July 1, 2027 as the expected award announcement. Treat both as planning information and wait for an official selection notice and agreement before committing the reimbursement.
Program pool versus individual award
- Estimated total Cycle 13 funding
- $370 million across selected projects, not one award
- Expected number of awards
- Dependent; the portal does not publish a fixed count
- Expected funding mix
- $230 million federal and $140 million state
- Benefit-cost-ratio pool
- $306 million
- Single-project reimbursement range
- $100,000 minimum to $10 million maximum
- Benefit-cost-ratio agency cap
- $10 million across an agency's selected BCR applications
- Guardrail set-aside
- $22.5 million total; $1.125 million maximum per agency
- Pedestrian crossing set-aside
- $23.4 million total; $360,000 maximum per agency
- Lane departure and bike set-asides
- $7.2 million each; $360,000 maximum per agency for each
- Tribal set-aside
- $3.6 million total; $360,000 maximum per Tribe
- Minimum HSIP reimbursement
- $100,000 per project, with case-by-case exceptions in the guidelines
- Maximum reimbursement ratio
- 100%, 90%, or 50% by countermeasure; lowest applicable ratio controls a mixed project
- Funding method
- Reimbursement after the agency uses its own funds and invoices Caltrans
- Published selection timing
- Webinar Q&A says March or April 2027; the portal lists July 1, 2027
- Portal period of performance
- Three to five years
Who can actually apply
- A California local public agency that owns, operates, and maintains public roadways may be eligible. The instructions identify cities, counties, federally recognized Tribes, and other local agencies that meet the criteria.
- The applying agency must have completed a Local Roadway Safety Plan or an accepted equivalent such as a Systemic Safety Analysis Report or Vision Zero Action Plan. It must be updated and validated at least every five years, and the Caltrans certification template is a required attachment.
- A finalized LRSP may support an application even if Board or Council approval is still pending at the cutoff. The instructions strongly recommend that approval, and Caltrans may request the plan itself.
- A local agency is ineligible for Cycle 13 if an existing HSIP project is red-flagged for unmet delivery requirements and the flag cannot be resolved by November 30, 2026. It is also ineligible if at least one existing HSIP project has not reached construction within five years of selection as of that date, even with an approved time extension.
- Eligible work must improve safety on a public road, publicly owned bicycle or pedestrian pathway or trail, or qualifying Tribal land. The project must identify a specific safety problem and substantially address it with eligible countermeasures that lead to completed construction and are consistent with the Strategic Highway Safety Plan.
- The guidelines are designed for projects that can be delivered promptly. A project must not require significant right-of-way acquisition, defined as more than 10% of construction cost, or extensive environmental review and mitigation. Certain large geometric improvements also require evidence of an incremental approach.
- The BCR route can include signalized intersections, non-signalized intersections, roadway segments, corridors, systemic work, or appropriate consolidated locations. It requires a calculated BCR of at least 5.0. A set-aside route must fit the exact guardrail, pedestrian crossing, lane departure, bike safety, or Tribal work described in the instructions.
- Only federally recognized California Tribes may use the Tribal set-aside. Other agency types may pursue the four non-Tribal set-asides if the project and applicant meet their specific rules.
- Work on or affecting the State Highway System needs the applicable Caltrans district support or neutral-support documentation. Joint projects and certain state-highway intersections require the additional scope, cost-share, ICE, or agreement evidence described in the instructions.
Deadline, forms, and submission sequence
- Confirm the applicant owns, operates, and maintains the affected public roadway and clear the Cycle 13 delayed-project eligibility screen. Review the current delivery-status reports with the District Local Assistance Engineer when an existing HSIP project could trigger a red flag.
- Complete or validate the LRSP or accepted equivalent and prepare the required Caltrans certification. Confirm that the plan is within the five-year update window and that the proposed project follows an identified safety priority.
- Define the safety problem, project limits, affected users, current conditions, and proposed construction countermeasures. Use a data-supported basis such as crash experience, crash potential, crash rate, or another accepted method, and verify that each countermeasure addresses the identified condition.
- Choose the BCR or one set-aside route before building the package. A BCR application needs an Analyzer result of at least 5.0. A set-aside application does not use BCR but must stay within its work, application-count, and per-agency cap. If the same project is submitted as alternatives, use the related application-ID convention and mark the alternatives as instructed.
- Download the current dynamic application form, the correct HSIP Analyzer and manual, LRSP certification, and BCR or set-aside Engineer's Checklist from the Cycle 13 page. Save dynamic PDFs locally and open them in a supported Adobe reader rather than relying on an in-browser preview.
- For a BCR application, enter the application identity, locations, countermeasures, the permitted three-to-five-year crash-data period, collision information, cost estimate, project phases, expected benefit, and reimbursement ratio in the BCR Analyzer. Resolve every validation error and reconcile its summary with the application form.
- For a set-aside application, select the exact set-aside, enter the location, eligible construction items, schedule, phase costs, and reimbursement ratio in the set-aside Analyzer. Separate eligible safety work from other project costs and stay within the set-aside's per-agency limit.
- Build the complete project cost, not only the requested reimbursement. Include preliminary engineering, right-of-way when applicable, construction, and construction engineering, and use the lowest applicable reimbursement ratio for mixed-countermeasure work. Do not treat the $10 million BCR agency cap as total project cost.
- Prepare the required attachments: LRSP certification, responsible-charge Engineer's Checklist, vicinity map, existing and proposed project maps or plans, at least two existing-condition photos, and the completed fillable HSIP Analyzer. Add collision diagrams and lists for BCR applications and warrant, Caltrans support, ICE, cost-share, or owner documentation when applicable.
- Make the form, Analyzer, narrative, maps, crash evidence, costs, schedule, and requested amount internally consistent. Required attachments omitted from the package and significant inconsistencies are fatal-flaw risks under the instructions. Combine files where necessary, preserve the required templates, and keep the complete application file within 500 MB.
- Have the licensed engineer in responsible charge complete the correct checklist. Use the dynamic form's Validate and Save function, clear all mandatory-field warnings, use the required application ID as the filename, close attachment files before embedding them, and verify that the final PDF opens with its attachments intact.
- Request one Smartsheet ticket per application through the Caltrans form. Open the automatic email, upload the completed final application form, click Submit Update, and retain the confirmation email. The official pages publish November 2 without a time zone, so submit early and ask Caltrans for the controlling clock rather than relying on a converted database timestamp.
How Caltrans screens, ranks, and prioritizes Cycle 13 applications
- Caltrans first applies the eligibility, procedure, completeness, and consistency rules. The instructions state that an incomplete package, a missing required attachment, or a significant inconsistency can be treated as a fatal flaw and removed from ranking and funding consideration.
- BCR applications must calculate at least 5.0 in the required HSIP Analyzer. Eligible BCR applications are prioritized from the largest BCR to the smallest, subject to the program rules and available funding.
- For a BCR application, reviewers check whether the selected crash types, collision data, location categories, and countermeasures correspond. The BCR manual identifies countermeasure misapplication and crash-data miscounting as common application flaws.
- Set-aside applications do not require a BCR. The official priority order first favors agencies without Cycle 11 or 12 awards, then agencies without an award under the same set-aside in those cycles, then jurisdictions with more fatal and severe-injury crashes in the latest three available years.
- Reviewers use the narrative and project records to assess the defined safety problem, project detail, feasibility, right-of-way, schedule, costs, requested reimbursement, and consistency with the proposed countermeasures. A support letter by itself is not a BCR ranking factor.
- The Analyzer establishes the construction and total project cost structure, maximum reimbursement ratio, expected benefit, and BCR where required. Reviewers can compare those values with the application form, maps, diagrams, lists, photos, and checklist.
- Special-rule identifiers and reporting questions may affect the funding type or program reporting without becoming ranking factors. The Cycle 13 webinar says the vulnerable-road-user identifier does not affect project selection and that the Analyzer's systemic-opportunity label is informational.
Readiness checklist
- Confirm the applicant is a qualifying California local road owner or operator.
- Check every existing HSIP project against the November 30 delayed-project exclusions.
- Complete and validate the LRSP or accepted equivalent within the five-year window.
- Use the required LRSP certification template and retain the plan for a Caltrans request.
- Identify a specific safety problem with data-supported locations and affected users.
- Choose BCR or the exact set-aside and verify the route-specific cap and work rules.
- Select eligible countermeasures and apply the official location and combination rules.
- Use three to five years of crash data for BCR and reconcile diagrams, lists, severity, and locations.
- Build construction and whole-project phase costs and calculate the applicable reimbursement ratio.
- Prepare a delivery schedule that meets the Cycle 13 authorization milestones.
- Prepare maps, existing/proposed plans, at least two photos, and the fillable HSIP Analyzer.
- Add warrants, State Highway System support, ICE, cost-share, owner, or incremental-approach evidence when triggered.
- Have the responsible-charge engineer complete the correct checklist and resolve every discrepancy.
- Validate the dynamic PDF, confirm embedded attachments and file size, and use the exact application ID filename.
- Request a separate Smartsheet ticket for each application and retain the final confirmation email.
- Confirm the official November 2 cutoff and any amendment with Caltrans before submission.
Primary sources
Related opportunities and the next search
- Search current traffic-safety infrastructure funding
Review current source-linked road, intersection, bicycle, pedestrian, and safety-infrastructure programs, then save a narrow alert when the visible set fits the agency plan.
- Search current highway and local-road improvement funding
Compare eligible applicant, geography, project type, match, delivery, and deadline rather than carrying Cycle 13 rules into another program.
- Review the transportation funding guide
Use the broader guide to separate planning, safety, transit, roadway, bridge, and other transportation funding routes and build a recurring monitoring workflow.
Analysis change log
- 2026-08-16: Initial analysis verified against the active California Grants Portal record, Caltrans Cycle 13 call page, July 2026 application instructions, Chapter 9 guidelines, both Cycle 13 Analyzer manuals, and the August 7 Q&A document from the July 21 webinar. It distinguishes the $370 million total from the $100,000 to $10 million single-project reimbursement range, the separate $10 million BCR agency cap, and five set-aside caps, preserves the source's timezone-unspecified November 2 deadline, and records the current eligibility, reimbursement, attachment, ranking, and submission rules.
Amount
$100,000 to $10 million per project; $10 million BCR cap per agency
Who can apply
California local public agencies that own, operate, and maintain public roadways may apply, including cities, counties, federally recognized Tribes, and other qualifying local agencies. A current LRSP or accepted equivalent and compliant HSIP delivery standing are required.
About this opportunity
The Highway Safety Improvement Program (HSIP), codified as Section 148 of Title 23, United States Code (23 U.S.C §148), is a core federal-aid program with the purpose to achieve a significant reduction in traffic fatalities and serious injuries on all public roads. The Division of Local Assistance (DLA) manages California's local agency share of HSIP funds. California's Local HSIP focuses on infrastructure projects with nationally recognized crash reduction factors (CRFs). Local HSIP projects must be identified on the basis of crash experience, crash potential, crash rate, or other data-supported means.