About this opportunity
Installation of a 13âsection lineup of 4.16â¯kV mainâtieâmain switchgear, positioned within an outdoor protectedâaisle enclosure and installed on a cable vault. The includes construction of underground ductbanks and installation of cables to provide feeders from the RED substation, a feeder tie-in to the CHP, associated distribution feeders, and reconfigure feeders to support construction phasing. The project also includes modifications to the RED substation to support the upgraded electrical infrastructure.