Skip to content
ClosedNo longer accepting applications

Stegall Substation Stage 07 Phase 01

ENERGY, DEPARTMENT OF

This opportunity closed August 10, 2026. 4 similar opportunities are open right now.

About this archived opportunity

The Stegall Substation Stage 07 Phase 01 Project (Equipment Replacements and Upgrades) replaces end of life equipment and installs a new control building. Replaced equipment shall include the 1960’s era control building, 30+ disconnect switches, problematic brown glass insulators, main bus reconductor and rating increase, 2-115kV oil circuit breakers, replace 1990’s vintage GE D20 RTU with three SEL RTACs, and add transfer bus dead end structure between 230kV east and west interconnect.

Historical details

Status
Closed
Deadline
August 10, 2026
First captured
June 30, 2026
Publisher reference
828387abfbce43029a083e66c1298fe9

Eligibility: Total Small Business Set-Aside (FAR 19.5). SBA

Free. One email, sent if this program reopens or a close match to it opens. We watch for 12 months, then stop. No list.

Refine this search