Bard Air Conditioner Replacements W36HY-B09 for NPS
DEPT OF DEFENSE.DEPT OF THE NAVY.NAVSUP.NAVSUP GLOBAL LOGISTICS SUPPORT.NAVSUP FLC SAN DIEGO.NAVSUP FLT LOG CTR SAN DIEGO
Place of performance: San Miguel, CA
Free. Verify your email, then we send one reminder only.
- Posted
- Aug 8, 2026
- Closes
- Aug 10, 2026 (tomorrow)
Similar opportunities open now
- Bard Air Conditioner Replacement W36HY-B09OpenDEPT OF DEFENSENo deadline listed
- 26 WPS - WT15754265 - Mini Split UpgradeOpenDEPT OF DEFENSECloses in 9 days
- Z--Facilities Maintenance and Repair IDIQOpenINTERIOR, DEPARTMENT OF THECloses in 11 days
- CDC ARSR HVAC ReplacementOpenTRANSPORTATION, DEPARTMENT OFCloses in 4 days
At a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the plumbing, heating, and air-conditioning contractors category. The deadline is August 10, 2026, 1 day from now. Work is performed in San Miguel, CA. This solicitation carries a SBA set-aside.
Classification and identifiers
- Industry (NAICS)
- Plumbing, Heating, and Air-Conditioning Contractors (238220)
- Product or service (PSC)
- Refrigeration and Air Conditioning Components (4130)
- Solicitation number
- 1301387097
- Set-aside
- SBA
Who can apply
Small businesses can apply here. Check the eligibility details below to see if your organization fits.
Total Small Business Set-Aside (FAR 19.5)
About this opportunity
Updated to move close date to Tuesday 400pm PST Questions and Answers anticpated to be published Monday 8/10. This solicitation is for Bard Air Conditioner Replacements W36HY-B09 at NPS remote site located at Camp Roberts, CA. See details in attached: 1) Solicitation N00244-26-Q-0070 2) Photos Bard HVAC Systems, Buildings 1 & 2 Field Lab High level background listed here. See Solicitation for full details 1.0 Background/Introduction: The Purpose of request is to for replace two (2) non-functioning Air Conditioning (A/C) units at the NPS remote site located at Camp Roberts, CA. 2.0 Scope: These units are imperative due to excessive temperatures in the Spring, Summer and Fall months exceeding 100F. Thus, preventing heat stress environment. Two of the 6 A/C units need to be replaced. 3.0 Task...