Bankhead Highway High Pressure Natural Gas Main Extension
Winder, City Of
Free. Verify your email, then we send one reminder only.
- Posted
- Aug 18, 2026
- Closes
- Sep 15, 2026 (in 27 days)
Similar opportunities open now
- IFB No. 27-001 Construction Services for Highway 99 Water and Sewer ExtensionOpenBrunswick-Glynn County Joint Water & Sewer CommissCloses in 13 days
- Water System Improvements Division IOpenReynolds, City OfCloses in 7 days
- DEEPSTEP ROAD PUMP STATION AND FORCEMANOpenSandersville, City OfCloses in 8 days
- Three (3) Natural Gas Pipeline Replacement Projects on Broad Street, Big A Road, and Davis AvenueOpenGeorgiaCloses in 8 days
- Bid Ref. #27-012 Natural Gas Pipeline ConstructionOpenAlbany, City OfCloses in 28 days
About this opportunity
BANKHEAD HIGHWAY HIGH PRESSURE NATURAL GAS MAIN EXTENSION The City of Winder (Owner) is requesting Bids for the construction of the following Project: Bankhead Highway High Pressure Natural Gas Main Extension Project Number: 250235 Bids for the construction of the Project will be received at the City of Winder Utilities Department located at 138 Sweetwater Trail, Winder, GA 30680, until September 15, 2026 at 10:00 a.m. local time. At that time the Bids received will be publicly opened and read. The Project includes the following Work: The Project consists of the installation of approximately 9,650 linear feet of 4-inch high pressure steel gas main, 30 linear feet of 4-inch polyethylene gas main, 150 linear feet of 2-inch high pressure steel gas main, trenched and untrenched installation, l...
Related opportunities
- IFB No. 27-001 Construction Services for Highway 99 Water and Sewer ExtensionBrunswick-Glynn County Joint Water & Sewer CommissCloses in 13 days
- Water System Improvements Division IReynolds, City OfCloses in 7 days
- DEEPSTEP ROAD PUMP STATION AND FORCEMANSandersville, City OfCloses in 8 days
- Three (3) Natural Gas Pipeline Replacement Projects on Broad Street, Big A Road, and Davis AvenueGeorgiaCloses in 8 days
- Bid Ref. #27-012 Natural Gas Pipeline ConstructionAlbany, City OfCloses in 28 days
- AMR Water Meter ReplacementBaconton, City OfCloses in 16 days